How to choose an industrial shredder

Picking an industrial shredder comes down to a handful of decisions — what you're shredding, how much, how small it needs to end up, and how it fits your floor. Here's how we'd walk you through it, in the order that matters.

1. Start with the material


The material decides the line more than anything else. Paper and cardboard at volume run on the paper series; hard drives on the hard-drive line; hard drives and SSDs on SelecShred™; plastics, product, packaging and e-scrap on Particle Cut or core shredders; cardboard cores and bottles on the core line. Mixed or unusual material is where a custom-engineered system earns its place. If you're processing more than one material, tell us all of them — it changes the recommendation.

2. Then size to your volume


Throughput sets the chamber size and horsepower. Be concrete about volume the way you measure it — sheets or pounds per hour, drives per day, tons per week — and whether it's occasional or all-shift. The range runs from compact units for lower volume up to continuous-duty lines built to run a full floor every shift; the honest match depends on your real numbers, so we'd rather size it to those than quote a headline figure.

3. Decide the finished size


How small the output needs to be is a security and downstream decision. Strip-cut gives the highest throughput at a larger piece; cross-cut is smaller and more secure; particle-cut is the finest and handles mixed bulk material. For media, SelecShred™ takes hard drives to a 1-1/2″ (38.1 mm) strip and SSDs to a 3/16″ × 3/8″ (4.8 × 9.5 mm) cross-cut. If you work to a standard — NIST SP 800-88, DIN 66399, HIPAA — tell us and we'll confirm the configuration that meets it.

4. Check footprint and power


Industrial shredders typically run on 230V or 460V, 3-phase, 60 Hz — we confirm the exact requirement per model. Just as important is the space: the cutting chamber, infeed and discharge, and room to work around it. Send us your floor dimensions and we'll design around them, in CAD, before a part is cut.

5. Think about the whole line, not just the machine


A shredder rarely works alone. Tippers load it without manual lifting, infeed and auto-feed conveyors keep it fed, output conveyors move the product, and balers compact it for transport or resale. Decide early whether you're buying a machine or engineering a line — it's cheaper to plan the handling in than to add it later.

6. Buy on total cost, not sticker price


Allegheny sells direct from the manufacturer — no dealer markup — and builds heavy so the machines last. The number that matters over a decade is cost to run: uptime, wear parts and service, all of which come direct from the plant in Delmont. Factor those in alongside the purchase price.

Match your material to a line


If you're shredding…The lineTypical cut
Paper & cardboard at volumePaper series (16–36)Strip · cross · particle
Hard drivesHard Drive line1-1/2″ (38.1 mm) strip
Hard drives + SSDsSelecShred™HDD strip + SSD cross-cut
Plastics, product & packagingParticle Cut · CoreParticle · 2″ (50.8 mm) strip
E-scrap (incl. circuit boards)Particle Cut1/2″ × variable (12.7 mm × variable) particle
Cardboard cores & bottlesCardboard & Core2″ (50.8 mm) strip
Mixed, bulk or unusualCustom-engineered systemSpecified to you

Common questions


How do I know what size shredder I need?

Tell us the material, how much you process (sheets/hour, drives/day, tons/week), the finished size you need and your floor space. We size the machine to those — from compact units to continuous-duty lines.

Strip-cut, cross-cut or particle-cut — which should I choose?

Strip-cut is highest throughput at a larger piece; cross-cut is smaller and more secure; particle-cut is finest and best for mixed bulk material. Your security standard and downstream use decide it.

Do I need just a shredder, or a whole system?

Either. A machine can run standalone, or we engineer a complete line — tippers, conveyors, auto-feed and baling — around your floor and volume.

What power supply do the machines need?

Typically 230V or 460V, 3-phase, 60 Hz. We confirm the exact requirement for your model.

Play · 2 minutesNot sure where to start? Play the Shred ChallengeThrow what you need destroyed into an Allegheny shredder. Three quick questions match you to the right machine.Play now →Shred Challenge title screen: a worker holding a hard drive next to an Allegheny shredder

Tell us what you need to process

Material, volume and floor space — we'll size the machine (or design the line) and reply fast.

Tell us what you need to process

Material, volume, and the result you need at the end. Help us understand your space — direct from the people who build the machine.